How to Configure and Manage ECO Approvals on ECO Stages in Odoo 18
Introduction
In complex manufacturing and product development environments, controlling changes properly is crucial. As an Odoo Consultant, one of the core tasks is to ensure that Engineering Change Orders (ECOs) flow through defined approval stages so that no change is applied without proper oversight.
In Odoo 18, the PLM (Product Lifecycle Management) module offers built-in support to configure ECO stages with designated approvers and rules for when approvals are mandatory, optional, or comment-only. This article walks you through how to set it up and manage the workflow reliably.
Understanding Key Concepts
What is an ECO in Odoo 18
An Engineering Change Order (ECO) in Odoo is a structured mechanism for managing modifications in Bills of Materials (BoMs), product designs, or routing. The change goes through multiple stages (e.g. New, In Progress, Validated, Effective) before being applied to production.
ECO Types and Stages
-
ECO Types categorize changes (such as “New Product Introduction” or “BoM Update”) and group ECOs into projects.
-
Stages represent progression milestones in the ECO’s lifecycle. Each stage can be configured with its own rules and approvers.
-
A typical best practice is to have at least one verification stage (with required approver) and a closing or effective stage where changes are applied.
Approval Types Available
When assigning approvers at a stage, Odoo supports three modes:
-
Is required to approve — mandatory approval before changes can proceed
-
Approves, but the approval is optional — the user can approve, but it’s not mandatory
-
Comments only — the user adds comments but their approval is not strictly required.
Step-by-Step: Configuring ECO Approval Workflow
1. Install and Access the PLM Module
-
Go to Apps
-
Search for PLM (Product Lifecycle Management) and install it, if not already.
-
Once installed, open the PLM app.
2. Define ECO Types
-
Navigate to Configuration → ECO Types
-
Click New to create a type
-
Provide a Name and optional Email Alias (to auto-create ECOs via email) .
-
Save the type
3. Configure ECO Stages
-
Within the PLM module, go to Configuration → ECO Stages
-
You’ll see existing stages; click New to add more
-
Fill fields such as:
-
Stage Name
-
ECO Type (the stage belongs to which type)
-
Checkboxes:
-
Folded in Kanban view — customize visibility in the Kanban board
-
Allow to apply changes — whether changes can be applied at this stage
-
Final stage — marks this as the last stage in the workflow.
-
-
-
Under the Approvals section, add lines:
-
Specify Role (e.g. Engineering Manager)
-
Choose User
-
Select Approval Type (Is required, Optional, or Comments only)
-
-
Save the stage
4. Best Practices in Stage Design
-
Make sure at least one stage is verification stage with an Is required to approve approver.
-
The Final stage should often enforce a required approval.
-
Intermediate stages can use optional or comment-only approvals to allow flexibility but maintain traceability.
Managing Approvals During an ECO Lifecycle
5. Creating an ECO
-
In PLM, go to Engineering Change Orders → New
-
Fill in details: Description, ECO Type, Apply On (Product or BoM), Product, BoM, etc.
-
Click Start Revision to begin the staged change process
6. Using the Stage Pipeline & Gantt View
-
The ECO appears in the Kanban or Gantt layout
-
Hover over a stage and use the gear or Edit option to modify stage-level approvers or behavior as needed.
7. Approval Actions (Approve / Reject / Comment)
-
When an ECO enters a stage that has a required approver, the assigned user will see Approve, Reject, or Apply Changes buttons (if allowed) .
-
For comment-only or optional types, the approver can leave a comment instead
-
Note: Apply Changes can only be executed after required approval (if set)
-
Automated Activity Notifications
-
Odoo creates activity reminders for approvers when ECOs reach stages that need their intervention.
-
Users can monitor pending approvals via “My Validations” or “All Validations” buttons in the PLM dashboard .
9. Dealing with Rejections
-
If an approver rejects the ECO, a follow-up activity can be scheduled
-
The ECO can be reverted to a prior stage, and modifications requested before resubmission.
Applying Approved Changes & Version Control
10. Final Stage Execution
-
Once the ECO reaches the final stage with required approval, users click Apply Changes
-
This updates the BoM version in production, archives the previous version, and activates the new version.
11. Version Control & Rebase Handling
-
Odoo retains past BoM versions tied to their ECOs, enabling traceability and rollback if needed.
-
In cases where multiple concurrent ECOs touch the same BoM, Apply Rebase can reconcile changes to maintain consistency.
Example Walkthrough (BoM Update for a Product)
Let’s consider a product “Coffee Powder”:
-
Create initial BoM with Coffee Beans + Packaging
-
Create an ECO of type BoM Update
-
Define new stages: New, In Progress, Validated, Final
-
Validated has required approval from a QA manager
-
Final is the closing stage
-
-
In ECO, add a new component (e.g. Silver Aluminium Pouch)
-
Move through the stages: skip optional approval, enter validated stage -> the QA manager must approve
-
Once approved, reach final stage and click Apply Changes
-
The product’s BoM version is updated to the new one
-
Previous BoM is archived for traceability.
Tips & Best Practices
-
Keep approval bottlenecks minimal — assign few but essential approvers.
-
Use comment-only modes for stages where feedback is helpful but not mandatory.
-
Notify stakeholders by email templates at key approvals.
-
Archive obsolete ECOs to maintain a clean pipeline.
-
Train your team so they understand each stage’s significance and when approval is needed.
Final Thoughts
Configuring and managing ECO approvals on ECO stages in Odoo 18 is a powerful way to enforce product integrity, compliance, and accountability. With the right stage design and approver settings, you can ensure that no design or process change slips into production unchecked.
As an Odoo Consultant, your role is to tailor this workflow to your organization’s structure and ensure smooth adoption. The PLM module’s built-in approval mechanism, version control, and audit trail make Odoo a strong choice for manufacturing and engineering development environments.
If you like, I can also generate a graphical flowchart or diagram of the ECO approval process to include in your article. Do you want me to build that for you?
Категории
Больше
Executive Summary Bickers Adams Edwards Syndrome Market Value, Size, Share and Projections CAGR Value The bickers adams edwards syndrome market is expected to gain growth at a potential rate of 4.80% in the forecast period of 2021 to 2028 The top notch Bickers Adams Edwards Syndrome Market report explains current and future market trends and carries out analysis of the impact of...
How have movies influenced fashion? In some cases, movies can inspire people to wear certain clothes or follow certain fashion trends. In other cases, movies may make people want to avoid certain styles altogether. Regardless of how it happens, cinema definitely has an impact on what we wear. Let's take a look at a few examples to see just how powerful this influence can be....
The rise of digital platforms has transformed the way people spend their leisure time online. Modern entertainment platforms focus on providing immersive and interactive experiences that go beyond passive consumption. Users can explore creative content, engage with dynamic features, and enjoy personalized experiences designed to keep them interested for longer periods. The Role of Technology in...
Introduction Coursework writing is an essential part of academic life, requiring precision, clarity, and well organized references. Proper citation not only strengthens your arguments but also avoids plagiarism, which is crucial for academic integrity. Managing numerous sources manually can be overwhelming, and some students even consider options to buy coursework online to meet tight...
University students in the UK often face intense pressure when it comes to academic writing. Research papers, in particular, require a high level of critical thinking, subject knowledge, time management, and advanced writing skills. As academic expectations continue to rise, many students seek support to ensure they submit high-quality work on time. This has led to the growing demand for...